This is a proposal with implications far too complex for me to hope to chip in very helpfully, but...
Wouldn't making the 251 require Battle Phase 2 be pretty a hefty nerf to its timing? BP2's a good bit more expensive than the T2 building and probably make the 251 arrive at the same time as the currently-justifiably later and tougher Soviet M5 HT. If this is not your intention, I would say to make the 251 require either T2 or BP2.
-
#Steam AliasWL%Streak
- 1.831222.789+37
- 2.611220.735+5
- 3.34957.860+14
- 4.1110614.644+11
- 5.276108.719+27
- 6.306114.729+2
- 7.916405.693-2
- 8.262137.657+3
- 9.722440.621+4
- 10.1041674.607-2